Any proposed works on an existing highway will require a form of Section 278 Agreement with the Local Highway Authority to facilitate the works. If a highway is to be adopted this will require a Section 38 Agreement with the Local Highway Authority. EAS can offer both the design services and administration to get a development efficiently through these often long winded agreements.
EAS often take part in negotiating fair and suitable S106 contributions for our clients. Contributions towards transport schemes are often based on the trip generation of a proposed development.